New Lights for the Bedroom – Part 2
New Lights for the Bedroom – Part 2

New Lights for the Bedroom – Part 2

In case you missed it, here is the previous link for this now-completed project:

PART 1 – HALFWAY THERE
PART 2 – COMPLETED!

We no longer have ugly 1980’s can lights in the master bedroom – woohoo!!!  Last Tuesday I installed the first two LED track lights I’d bought at IKEA, and this afternoon I spent 3 hours installing the remaining two.  I seriously thought I’d been up there for an hour, but I started at 2pm and didn’t emerge from the bedroom until 5pm!  Just in time for Happy Hour – woohoo!  🙂  As I write this, I’m enjoying a glass of well earned Sangria.  Numnumnum!  I’m not very familiar with Sangria, but Jim’s mom loved it and Jim’s parent’s dear friends the Dominski’s make a killer homemade Sangria, so when I was shopping for wine after work yesterday I decided to give it a try, and it’s really, really good!

141a        141b

First I set up my ladder under the more accessible can light:

141c

Then scampered down to the basement to kill power to the bedroom:

141d

Then I climbed up with my Little Giant Cargo Hold work pouch and set it up at the top:

141e        141f

It’s always important to choose proper footwear when you’ll be climbing up and down a ladder:

141g

While I was up there I realized just how badly the ceiling is cracked along the wall/ceiling line.  I’ll have to fix that at some point.  It’s very similar to my very first DIY project:

141h        141i

I also realized how many dust-bunnies were nestled along the beam.  Gross.  I grabbed the feather-duster and took care of them:

141j

And look how gross the old can light is!  That’s a thick layer of dust:

141k

I guess that’s what happens when you ignore the things up in your cathedral ceiling.  Humph.

A few minutes of wiring and the new track light was installed:

141l

While I was up on the ladder I also organized the cubbie unit above Jim’s built-in:

141m        141n

It doesn’t look a whole lot different in the picture, but it looks much better in person!

One more trip up the ladder to install the 3 LED bulbs and light one is done!

141o

Then I moved on to the 2nd light, which was a lot trickier because it’s higher up and closer to the wall:

141p        141q

I realized the A-frame configuration of my ladder wasn’t going to work.  D’oh!!!  I even tried shimmying one of the legs out onto the deck, but the doorway wasn’t wide enough, and I still couldn’t easily reach the light:

141r

So I had to set it up in the extension-ladder configuration:

141s        141t

The dust bunnies on that side of the beam were even worse:

141u

I took care of them, and then, 3 hours after I started, both lights were done:

141v

Yay!  Much better than the old cans:

139e

Tomorrow, if I feel like it, I’ll install the 3 lights in the girl cave!

(Visited 343 times, 1 visits today)

One comment

Leave a Comment!